Proposed Filming Schedule
This was the filming scheduale that I had initally agreed to stick to. However, for reasons out of my control like the weather etc, I have had to change this to the schedule under this one. I have managed to complete it in the same amount of time as planned but I just had to adjust the timings and scheduale a copuple more months filming further into the year.
Date
|
What I will be Filming
|
28th September 2013
|
I will be filming down at Knypersley Pool. I have found a few locations that will work very well in the music video. I will be filming some long shots and medium close up shots, as these short clips will be used a cut in shots.
|
29th September 2013
|
I will be looking at the footage that I had shot from the previous day and will be seeing if I need to shoot anymore footage down at Knypersley pool.
|
5th October 2013
|
I will be preparing for shooting the rest of the video and will take the artist and explain the shots that I intend to shoot. I will then get the artist to have a run through ready for the following days shooting.
|
6th October 2013
|
I will e shooting the majority of the music video over two days. On this day I will be shooting the music video on the farm. This will allow me to get most of the shots that I want. I will be filming the outdoor shots, and the travelling shots.
|
7th October 2013
|
On this day I will be shooting the barn parts of the video and will be seeing if I need to film any of the outside space again. This will allow me to be able to get all of the shots that I want and I ill have the artist there to re shoot any scenes. This should be the last day of filming, but if anymore scenes need to be shot, I will do so.
|
28th October 2013
|
I will be shooting more in the barn today. This will allow me more time to maximise my assets and be able to have more freedom when I am editing the shots.
|
29th October 2013
|
I will be filming more shots at Knypersley pool today. This will allow me to get some shots that I can use in the video and to get them using the right angles. This will allow much more freedom to get shots I can use as a transition and to be able to make the shots really interesting.
|
30th October 2013
|
This is a buffer day. This allows me to go back to places if I want a particular shot, or to start to edit the filming I have done.
|
31st October 2013
|
This is a buffer day. This allows me to go back to places if I want a particular shot, or to start to edit the filming I have done.
|
1st November 2013
|
This is a buffer day. This allows me to go back to places if I want a particular shot, or to start to edit the filming I have done.
|
Proposed Filming Schedule
Date
|
What I will be Filming
|
28th September 2013
|
I will be filming down at Knypersley Pool. I have found a few locations that will work very well in the music video. I will be filming some long shots and medium close up shots, as these short clips will be used a cut in shots.
|
29th September 2013
|
I will be looking at the footage that I had shot from the previous day and will be seeing if I need to shoot anymore footage down at Knypersley pool.
|
5th October 2013
|
I will be preparing for shooting the rest of the video and will take the artist and explain the shots that I intend to shoot. I will then get the artist to have a run through ready for the following days shooting.
|
6th October 2013
|
I will e shooting the majority of the music video over two days. On this day I will be shooting the music video on the farm. This will allow me to get most of the shots that I want. I will be filming the outdoor shots, and the travelling shots.
|
7th October 2013
|
On this day I will be shooting the barn parts of the video and will be seeing if I need to film any of the outside space again. This will allow me to be able to get all of the shots that I want and I ill have the artist there to re shoot any scenes. This should be the last day of filming, but if anymore scenes need to be shot, I will do so.
|
9th November 2013
|
I will be shooting more in the barn today. This will allow me more time to maximise my assets and be able to have more freedom when I am editing the shots.
|
10th November 2013
|
I will be filming more shots at Knypersley pool today. This will allow me to get some shots that I can use in the video and to get them using the right angles. This will allow much more freedom to get shots I can use as a transition and to be able to make the shots really interesting.
|
16th November 2013
|
This is a buffer day. This allows me to go back to places if I want a particular shot, or to start to edit the filming I have done.
|
21st November 2013
|
This is a buffer day. This allows me to go back to places if I want a particular shot, or to start to edit the filming I have done.
|
22nd November 2013
|
This is a buffer day. This allows me to go back to places if I want a particular shot, or to start to edit the filming I have done.
|