Proposed Filming Schedule
|
Date
|
What I
will be Filming
|
|
28th September 2013
|
I will be
filming down at Knypersley Pool. I have found a few locations that will work
very well in the music video. I will be filming some long shots and medium
close up shots, as these short clips will be used a cut in shots.
|
|
29th September 2013
|
I will be
looking at the footage that I had shot from the previous day and will be
seeing if I need to shoot anymore footage down at Knypersley pool.
|
|
5th October 2013
|
I will be
preparing for shooting the rest of the video and will take the artist and
explain the shots that I intend to shoot. I will then get the artist to have
a run through ready for the following days shooting.
|
|
6th October 2013
|
I will e
shooting the majority of the music video over two days. On this day I will be
shooting the music video on the farm. This will allow me to get most of the
shots that I want. I will be filming the outdoor shots, and the travelling
shots.
|
|
7th October 2013
|
On this
day I will be shooting the barn parts of the video and will be seeing if I
need to film any of the outside space again. This will allow me to be able to
get all of the shots that I want and I ill have the artist there to re shoot
any scenes. This should be the last day of filming, but if anymore scenes need
to be shot, I will do so.
|
|
28th
October 2013
|
I will be
shooting more in the barn today. This will allow me more time to maximise my
assets and be able to have more freedom when I am editing the shots.
|
|
29th
October 2013
|
I will be
filming more shots at Knypersley pool today. This will allow me to get some
shots that I can use in the video and to get them using the right angles. This
will allow much more freedom to get shots I can use as a transition and to be
able to make the shots really interesting.
|
|
30th
October 2013
|
This is a
buffer day. This allows me to go back to places if I want a particular shot,
or to start to edit the filming I have done.
|
|
31st
October 2013
|
This is a
buffer day. This allows me to go back to places if I want a particular shot,
or to start to edit the filming I have done.
|
|
1st
November 2013
|
This is a
buffer day. This allows me to go back to places if I want a particular shot,
or to start to edit the filming I have done.
|
No comments:
Post a Comment